STAGE BY STAGEWhat happens at each stage
Every stage has a defined output. Nothing moves forward until that output exists.
PLAN
Before anything is built we agree the scope, the budget and the programme, and we make sure the drawings and approvals are ready to support them.
- Brief review and feasibility
- Work breakdown and baseline programme
- Budget preparation and approval
- Design and statutory readiness check
MANAGE
Contractors and vendors are appointed through a structured tender, then held to the scope, the rates and the dates they signed up to.
- Tendering and contractor appointment
- Procurement and long-lead tracking
- Resource and manpower planning
- Coordination between all consultants
MONITOR
Progress is measured on site against the baseline every week, with photographic records and a written report rather than a verbal update.
- Daily site supervision
- Weekly progress measurement
- Photographic and written records
- Look-ahead schedules and recovery plans
CONTROL
Quality checklists, material approvals and a live cost report keep the two things that matter most from drifting quietly out of hand.
- Stage-wise quality inspection
- Material approval and testing
- Variation and change control
- Monthly cost and forecast report
DELIVER
Testing and commissioning are witnessed, snags are cleared and the complete handover documentation is compiled before the client takes possession.
- Testing and commissioning
- Snag list issue and clearance
- As-built drawings and O&M manuals
- Statutory completion approvals
SUCCESS
Final accounts are settled, retention is scheduled and we stay available through the defect liability period.
- Final account settlement
- Retention release schedule
- Defect liability support
- Post-completion review